archive blog
How Does Seattle Assign an Address to a New DADU?
SDCI gives each new backyard cottage in Seattle its own address. See which units qualify, how numbers follow the street grid and frontage, when a letter is added, what the request and site plan need, who gets notified and where to post the number.
Which Inspections Happen Before a DADU Can Be Occupied?
DADU building inspections in Seattle run from early site work through a building final. The permit holder requests each visit, trade permits have their own inspections, and approval to occupy is usually an OK to Occupy note rather than a certificate of occupancy. See the typical sequence and how to read the result.
How Should You Set Expectations for the DADU Permit Timeline?
A DADU permit timeline in Seattle moves through set phases, from pre-application to issuance. Learn what SDCI Tip 116B says about intake waits, fees and correction letters. See how the review cycle, pre-approved plans and the SDCI timeline tool affect planning.
Why Do DADU Permit Applications Receive Corrections?
ADU permit corrections are a routine part of Seattle review, and SDCI sets clear rules for each reply. Learn when you can respond, how to answer every comment and how to upload a complete plan set in the portal. See which mistakes SDCI cannot fix and which large changes may add fees.
How Do Seattle Preapproved DADU Plans Work?
A Seattle preapproved DADU plan means the city has reviewed the building design, but your lot still gets reviewed. Learn the three SDCI conditions for the faster path and how the designer’s royalty works. See what a homeowner can change and what the city still checks on site.
What Documents Do Homeowners Need for a DADU Application?
DADU permit documents for a Seattle backyard cottage come from the owner, signed forms and the design team. Learn what SDCI checks at intake, what Tip 103 asks a site plan to show and which records owners gather. See why the existing house needs floor plans and how forms must be uploaded.
What Happens During Seattle DADU Plan Review?
A Seattle DADU review sends one plan set through several code checks at SDCI. Learn how a project reaches intake and which drawings Tip 116B requires. See what land use, building, structural, energy and stormwater reviewers look for, which life safety items must appear and how corrections, fees and permit issuance work.
Which Permits Does a Seattle DADU Require?
DADU permit requirements in Seattle start with one main SDCI construction permit. Learn which trade permits and utility steps usually follow, when environmentally critical areas or trees add reviews, how inspections work after issuance and who handles each approval, including Tip 116B and the SDCI ADU pages.
How Seattle Middle Housing Changes Affect ADU Planning
Seattle middle housing rules took effect January 21, 2026, and let many Neighborhood Residential lots hold four or more homes. Learn how the density options, the two ADU limit, floor area, height, setbacks and parking work, why an ADU cannot be split off through subdivision and when a single backyard cottage is still the simpler path.
When Protected Trees Affect DADU Placement
Seattle DADU trees often decide where a backyard cottage can sit. Learn how Seattle sorts trees into tiers, how a tree protection area is measured and adjusted, when a Tier 2 tree may be removed on a Neighborhood Residential lot, how retained trees can raise the height limit and what to check with an arborist and SDCI before design starts.